This i brown coal power plant in Belchatow in Poland, 4,44 GW, and open mine of brown coal. Chimney are 333 meter high to You can imagine how huge is hole, in my humble opinion about 10km x 3km, enjoy

Share and Enjoy:
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google

10 Comments

  1. naydah, December 19, 2008:

    zasypali odkrywkę ? To skąd biorą teraz węgiel ??

  2. kabelak123, December 25, 2008:

    It’s nice, isn’t it ?? :D I live about 30 km from this hole and power plant and I can see chimneys from my window

  3. farmerbrown123, December 27, 2008:

    HOLY CRAP!!

  4. wildhunter666, December 27, 2008:

    to fakt, ostro zasuwaja tam z produkcja, pozdro z GB

  5. Polsza14, December 29, 2008:

    nikt oprocz Polakow nie ma takiej elektrowni jak Belchatow!!! 5/5

  6. darkmetallink1, December 29, 2008:

    Mmm, noup, i’m sorry about that, It’s kinda complicated to take pictures of the interior of a power plant due to company policies and stuff.
    But the good thing is that google earth exists =D
    The whole extraction process alone is quite a feat, which explains why so much energy is required.
    Companies want to avoid a mass consumption of the Canadian power grid so thats the reason of the major construction bill. :)

  7. wildhunter666, December 30, 2008:

    everything in canda is big, i read about this project, wow, just amazing, big scale planning really, 15GW for extraction of oil? omfg! amazing, do You have any private photos of movies of HSprings?

  8. darkmetallink1, December 30, 2008:

    Hahaha, well, as long as the mafia’s around, we don’t have to worry about having an extra limb, Hahahaha.

    Apparently, due to the tar sands that are gonna be exploited in Canada, by 2015, in that area (Alberta), they’re gonna require a consumtion of 15GW, all dedicated to the extraction of Oil.
    Look it up in Wikipedia, I found out because my father was given a project managing post for “HyperSprings” now to start in March.
    It’s quite a big area to drill if you ask me.

  9. wildhunter666, December 31, 2008:

    they are building another 2 blocks per 0.4GW each, coal mafia doesn`t allow to build nuclear power plant in Poland……

  10. darkmetallink1, January 1, 2009:

    Damn! 4.44 Gw? thats quite some production…